Integrations
Connect Autodesk ACC, link a project to one there, and keep its issues, models, element statuses and forms in sync.
An integration keeps a project in step with a project in another system: Autodesk Construction Cloud (ACC, and BIM 360 projects in it) or Procore (see Procore below). What it can keep in step with ACC:
- Issues — both ways, field for field, with their pushpin, their people, their files and images.
- Models — files you pick in ACC become models here, and take newer versions as ACC gets them. Model Coordination views become views that stay in step.
- Element statuses — ACC Assets' statuses on the elements of your converted models.
- Forms — ACC's form templates come in read-only, and their forms sync both ways.
It takes two steps, done once: an organization admin connects ACC for the organization, then a project admin links a project to one in ACC and chooses what syncs which way. From then on the project syncs by itself, every 15 minutes.
Who can do what
| Task | Who |
|---|---|
| Connect ACC, connect it again, turn a connection off or remove it | Organization owners and admins |
| Link a project, choose what syncs, pause or remove an integration | Project admins |
| Sync now, run a full sync, decide conflicts | Project admins |
| See the Sync area (runs, integrations, conflicts) and the sync panel | Project admins |
| Import models from ACC, update the ones brought in | Anyone whose Models level allows it (see Models) |
| Work on synced issues and forms | Anyone who may, as with any other issue or form |
A sync runs as the person who linked the project: it reads and writes in Gamma what they may. In ACC it reads and writes what the connection's Autodesk account may. If the person who linked it loses access to the project, the sync stops and says so.
Connect ACC
Open Organization tools › Connections. Every provider has a card; click Connect on Autodesk ACC.
Keep or change the connection's name, and click Connect with Autodesk ACC.
Sign in to Autodesk and allow Gamma to reach your projects. Gamma never sees your password. You come back to the Connections page with the connection saved.
The connection acts as the Autodesk account that signed in: it reaches the hubs and projects that account reaches. Its card says Connected; Manage opens it. Add connection connects the same provider a second time, with another account. Providers Gamma does not connect to yet are shown as Not available yet. Connect again to use another account, or when Autodesk asks for the sign-in again (the connection says so). Turn off stops every project syncing through it without losing anything; Remove is refused while a project still syncs through it.
Link a project
In the project, open Sync › Integrations. Each of the organization's connections has a card; click Connect on the one to link through. (Add integration links another project over there through a connection already in use.)
Choose the Project in Autodesk ACC — a list you can search. Component library projects are left out.
Under What syncs, turn on each of Issues, Models, Statuses and Forms to sync. Turned on, it syncs every way the connection allows; when that is more than one, choose under it: From Autodesk ACC into Gamma, From Gamma to Autodesk ACC or Both ways between Gamma and Autodesk ACC.
For issues and statuses, choose whether to bring in what only ACC has (see below). For models, choose whether to Import models with their Autodesk ACC folders (see Models). For statuses, Edit the Asset import and element matching: the asset categories to bring in, and the models to search when matching (see Element statuses).
Under Advanced, choose what happens When both sides changed: Ask someone to decide, The version in Gamma wins or The version in Autodesk ACC wins.
Save. Saving runs no sync and changes no records: the first run follows within seconds, then one every 15 minutes.
The integration's card then shows the project in ACC and how its runs are going; Manage opens it again, with Sync now and the full sync at the top. Pause syncing stops the runs until you turn it off again. Remove unlinks the project: nothing is deleted in the other system. The asset attributes it showed on elements go with it. When it brought in status sets and categories (ACC Assets), the confirmation asks whether to delete them too, saying how many sets, categories and elements holding a status in them that is. Left unchecked, they stay as the project's own — you can edit them — and elements keep their statuses. Checked, its categories go with the statuses elements hold in them, and its sets too unless one of your own categories uses them.
Issues
The schema mirrored from ACC
Linking a project that syncs issues creates a schema of its own, Autodesk ACC · project name, which holds ACC's issue layout:
- ACC's types and subtypes are its categories. Inactive ones are kept, marked Inactive, for the issues already filed under them; they are no longer offered for new issues.
- ACC's fields are its fields: status, assigned to, watchers, description, start and due dates, location, root cause, and every custom attribute.
- Each subtype's own layout comes along: its fields in ACC's order, which of them are required and which it hides. The issue sheet shows a subtype's fields in that order.
- The statuses keep ACC's colours.
The schema follows ACC: each run reads the layout again. It is read-only here — change types, fields and layouts in ACC. On the schema page, its categories show as ACC's Types page (each type with its subtypes, active or not, and the custom fields it shows); click a subtype to see its fields, required or not, visible or hidden. A location or a root cause field opens its whole tree from the eye beside it.
You can still rename the schema, and turn off Offer for new issues: then nobody can file a new issue in it — in the app, the AR app or a BCF import — while issues coming from ACC still come in.
Which issues come in
An issue created in Gamma in the mirrored schema goes to ACC (when issues sync that way). An issue that exists only in ACC comes in only when Import issues created in Autodesk ACC is on, and only while it is open and has a 3D pushpin on a model — the same rule the previous platform used. One left out comes in once it qualifies.
The periodic runs only read what changed in ACC since the project was linked. To bring in issues that were already in ACC before, run a full sync once (below).
What travels with an issue
- Fields — every value, in the mirrored field. A select travels by its option's name, a tree by its node.
- People — the assignee and watchers, matched to the project's members by email address. Someone who is not on both sides is kept as they are on the other side; so is a company or role assigned in ACC.
- Files — Gamma's attachments go to the ACC issue; ACC's photos and images come in once, when the issue is brought in.
- Pushpin — where the issue sits on its model, both ways.
- Deletes — an issue deleted in ACC goes to Gamma's trash and is unlinked. A delete in Gamma is never sent to ACC.
In the issue list, the External IDs column shows each synced issue's own number in ACC, with Autodesk's mark: click it to open the issue in ACC. Hide or move it from the list's columns menu, like any other column.
Models
Once an integration syncs Models, the Models page offers Import from Autodesk ACC: a page where you pick files in ACC's folders, and Model Coordination views, to bring in. Each file becomes a model here, converted from ACC's own conversion, with nothing to upload. The Models page of this guide walks through it.
- Where they go. With Import models with their Autodesk ACC folders on (the integration's setting, under Models), models go into folders that mirror their folders in ACC, follow their files when they move, and update themselves. The mirrored folders are a root of their own in the models' folder tree and cannot be changed in Gamma. Off, models go into the folder you were in. See Where imported models go.
- Newer versions. The models list marks a model that came from ACC and says when ACC has a newer version. Take version n brings it in by hand; with automatic update on, the integration's next run does it, usually within minutes. See Models brought in from Autodesk ACC.
- Coordination views. A Model Coordination view imported here becomes a view that follows it: each run brings in the files added to it and their new versions. See Views that follow a Model Coordination view.
Element statuses
For a project whose elements are tracked in ACC Assets:
- Only the asset categories you choose on the integration come in, each with everything under it, what is added there later too. With none chosen, no asset comes in. A category you leave out later is archived here; nothing changes in ACC.
- ACC's status sets and categories come into the status configurator as Autodesk ACC · name, with their colours.
- An asset is matched to an element by the GAMMA AR REFERENCE ID attribute it carries (an IFC GlobalId, an original id or a Revit id), which the integration adds to ACC for you. Several assets naming one element are never matched; the run's log lists them.
- A matched element's status syncs both ways. The first time, if the two sides disagree, it is a conflict — nothing is overwritten.
- With Import statuses from Autodesk ACC assets on, elements on the converted models get their asset's status even when nobody tracked them here yet.
- A matched element also shows its asset's location, barcode, description and the custom attributes of its category, on the Properties tab of its card, with a link to open the asset in ACC. They come from ACC each run and are read-only here: change them in ACC.
Forms
- ACC's folders and templates come into Forms › Templates, under a folder named Autodesk ACC. They are read-only here: change them in ACC. A native template's layout becomes its sections, a new layout in ACC a new version here; a PDF template keeps its PDF. A template removed in ACC is archived.
- ACC's forms come in with their status, due date and answers, tables included. Changes made in Gamma go back to ACC.
- A PDF form's answers cannot be written into ACC. When one is submitted here, ACC gets the form (made there if it was not yet) with its status, and the filled PDF, saved in ACC Docs under Project Files › GAMMA AR and attached to the form. A resubmission adds a new version of that file.
- If ACC refuses a form for good — one only its author may edit — it is skipped and the run moves on. It is tried again when it changes.
- When a template needs a review in ACC, a form submitted here goes to ACC as In review; when ACC is missing a required answer (a signature, which only ACC can take), ACC keeps its status and Gamma keeps its own.
Following a sync
In a project with an integration, the sync button beside the bell opens the sync panel:
- Each run, part by part — Models, Statuses, Forms, Issues — and the step each is at: waiting, preparing, reading the changes, sending or bringing in so many, done or failed.
- The last run and when the next is due. Sync now runs one straight away.
- Conflicts to review, also counted on the button. Open the run opens the run in the Sync area.
Syncs do not appear in your notifications: they run on their own, and the panel and the Sync area are where they show.
The Sync area
Sync, in the project's menu, has three pages for project admins: Runs, Integrations and Conflicts.
Runs lists every sync, newest first, with its integration, its mode (Changes for a periodic run, Full, Selected records, Conflict decision) and what it synced. Click one to open it:
- The run is drawn as its lanes — Models, Statuses, Forms, Issues — each with its steps and counts.
- Click a lane or a step to see its records, one per thing the run touched, filtered by outcome. An issue, a form or a status shows what was created or updated on which side, field by field. A failed record shows the error, what it was trying to write and what ACC answered.
- The Models lane has a record for each model it did something to: Updated (a new version brought in), Created (a file a followed coordination view brought in as a new model), Skipped with the reason (still converting in ACC, the file or its view no longer there, or failed three times in this version of the coordination view) or Failed. A model with nothing new leaves no record. Each record links to the model here and, where ACC gives an address for it, to the file in ACC.
- A model, a form or a status that fails does not stop the run: the lane finishes, and its step shows the failed count.
A run that failed or was canceled has Re-run: the same request again, as a new run, against the data as it is today. A run that left records failing has Re-run the failed records: it syncs only those again — issues, forms and element statuses — each the way it failed. Failed model records are not included; re-run the whole run for them, or wait for the next one.
Integrations shows each integration's health: when it last synced and when it next tries. One whose last run left records failing shows a warning, The last run left N records failing, with Open that run. Nobody is notified of it — only an integration whose runs keep failing sends the An integration keeps failing to sync notification.
Full sync
Preview full sync, in the integration's panel (Sync › Integrations › Manage), walks every issue on both sides and shows what a full sync would do, writing nothing. Run full sync then does it: it compares every issue from the start, creates what is missing on either side, and also brings models, statuses and forms in step. Use it once after linking, to bring in what ACC already had, or after a gap.
Conflicts
When an issue, a status or a form changed differently on both sides since they last agreed, and the integration is set to Ask someone to decide, the sync leaves it as it is on both sides and lists it under Sync › Conflicts.
Open one to Compare: what they last agreed, Gamma's and ACC's, side by side, with what differs marked. Then Keep Gamma's (written to ACC), Keep Autodesk ACC's (written into Gamma), Choose per field, or Decide later. A job carries the decision out and closes the conflict once both sides hold the result. If either side changed again meanwhile, the conflict comes back to you with what they hold now.
With The version in Gamma wins or The version in Autodesk ACC wins, conflicts are settled by that rule and never listed.
A create that was cut off
Sometimes a sync is interrupted while it is creating an issue or a form in ACC, and cannot tell whether ACC made it. Rather than risk making it twice, the sync holds the record and, if it is still unfinished ten minutes later, lists it under Sync › Conflicts whatever the integration's conflict rule. Open it and choose:
- Link: connects the record to the one already in ACC, by its id there. Nothing is created. When ACC did answer with the id of what it made, that id is filled in for you.
- Create again: creates it in ACC once more. If the first one did go through, it stays in ACC, linked to nothing, and is never brought into Gamma: delete it there by hand if it is not wanted.
Until you decide, each run reports the record as a conflict and does not create it again.
Procore
Connect Procore the same way: Organization tools › Connections, Connect on Procore, then Connect with Procore. The connection reaches the companies and projects that Procore account reaches.
Procore keeps two kinds of issue, in two tools: Observations and Coordination issues. When you link a project, the list shows each Procore project once per tool it has turned on — Tower · Observations, Tower · Coordination issues. An integration syncs one tool; to sync both, add two integrations, each with a schema of its own.
What syncs, both ways:
- Observations — the title, the type (under the category Procore groups it in), status, priority, assignee, distribution, due date, description, location and trade. Gamma's files go to the observation as its images.
- Coordination issues — the title, the type (clash, design review…), status, priority, assignee, due date, description, location and trade. Gamma's files go as attachments.
- People are matched by email to the project's members.
- With Import issues created in Procore on, the ones still open come in; run a full sync once to bring in what Procore already had.
- An issue deleted in Procore goes to Gamma's trash.
- In the issue list, the External IDs column shows Procore's own number, which opens it in Procore.
Not synced: Procore has no 3D pin, models, forms or element statuses to keep in step. Observation custom fields, hazards, contributing behaviors and conditions and specification sections do not come along yet.
When something looks wrong
- An issue in ACC does not come in. Check that Import issues created in Autodesk ACC is on, that the issue is open and has a 3D pushpin, and — for one older than the link — run a full sync.
- A run failed. Open it from the sync panel (Open the run) or from Sync › Runs: the failed step's records say which record failed and why, and Open the log has the run line by line. A failed record is tried again on the next run; Re-run the failed records tries them at once.
- An integration shows a warning. Its last run finished but left records failing. Open that run to see which.
- A model does not take its new version. Check that its automatic update is on, and that ACC has finished converting the version: until then the run skips it. If the model's row shows that its file or view is no longer there, it was deleted in ACC.
- The connection asks to connect again. Autodesk no longer accepts its sign-in: an organization admin opens Connections and clicks Connect again.
- The sync stopped. It runs as whoever linked the project: if they left the project or the organization, a project admin removes the integration and links it again.
For scripts, see the API reference for connections and for integrations and conflicts.
